← How to fuse ordinary hydrogen

✨ Energy and economics

How the reactor turns fusion energy into electricity and what it costs to build.

Electricity generation

The expanding products from each pulse heat the graphite first wall. A heat engine turns that heat into electricity, some of which powers the next pulses and the equipment that recovers and processes fuel. After those costs, the plant exports 9.87 × 1021 W from 3.56 × 1022 kg of equipment: 277.68 mW/kg.

For every 100 units of nuclear energy released, about 7.6 leave with neutrinos, 34.7 are exported as electricity, and 57.7 become waste heat. The table follows the energy through the plant, including the energy put back into preparing pulses.

Average energy balance
StepMeV per net helium nucleusPower (1020 W)% of nuclear energy
Nuclear energy released26.735284.478100.00%
Neutrinos leaving−2.019−21.482−7.55%
Non-neutrino energy24.716262.99692.45%
Prepared pulse energy returned+1.955+20.803+7.31%
Heat routed to cold equipment−1.808−19.242−6.76%
Heat supplied to engine24.863264.55893.00%
Engine heat rejected−11.295−120.185−42.25%
Gross electricity13.568144.37350.75%
Pulse preparation electricity−3.258−34.672−12.19%
Ordinary auxiliaries−1.031−10.970−3.86%
Routine refurbishment and support−0.000−0.003−0.00%
Net electricity exported9.27898.72834.70%

The table is averaged over the plant’s operating schedule. It uses the plant balance; the separate allocated plant data provide the underlying pulse and isotope calculations. Values in the table are rounded. The plant account describes the calculation and its assumptions.

The first wall supplies heat at roughly 1,600 K, and the radiators reject it at about 400 K. The calculation assumes a 54.6% heat-to-electric conversion efficiency. The radiators also absorb infrared from the surrounding Dyson swarm: together with reactor waste heat, this brings their total load to about 1.66 × 1022 W. They cover about 83.5% of the outer surface.

How the energy balance is calculated

Each completed cycle releases about 26.735 MeV per net helium nucleus, including positron annihilation. After neutrinos carry away 2.019 MeV, 24.716 MeV remains. Preparing subsequent pulses adds 1.955 MeV to the first wall but uses 3.258 MeV of electricity, assuming 60% electrical-to-pulse efficiency. The plant charges the remaining electrical loads separately.

In the first wall transport calculation, 93.57% of hot-boundary energy reaches the hot first wall; the rest is routed to cold equipment. The first wall has a radius of 1.1 × 109 m and contains 350 kg/m² of hot graphite. A regenerative gas cycle supports the 54.6% conversion assumption at the specified component performance; the ideal Carnot limit between 1,600 K and 400 K is about 75%.

The shared cavity runs nitrogen-15 pulses about every 779.0 minutes, nitrogen-14 every 0.587 days, carbon-12 every 0.715 days, and carbon-13 every 8.10 days. A 370-day schedule fits 1,879 pulses while accounting for material in storage. The CNO pulse stages page describes the individual pulses.

Economics

At 277.68 mW/kg, the reactor needs about 3.60 kg of equipment per net watt. That is much heavier per watt than solar panels or nuclear reactors. Its appeal is the fuel: ordinary hydrogen is abundant, and the reactor needs only a small continuing supply of carbon catalyst.

How long it takes to repay the energy used to build the plant depends on the energy cost of construction. At 100 MJ/kg of equipment, it takes about 11.4 years of continuous net output to generate the same amount of energy. Each 1 MJ/kg adds about 0.114 years to that payback time.

The first wall alone contains about 5.32 × 1021 kg of carbon. If carbon and hydrogen are available at a mass ratio of 0.007 and all the carbon is recovered, acquiring that carbon means accessing about 7.60 × 1023 kg of associated hydrogen.

Construction energy example

Converting methane to the graphite needed for the first wall requires energy as well. At 50% conversion into the useful free-energy increase, this chemical step alone would take the equivalent of about 0.145 years of plant output; at 99%, about 0.073 years. These figures use NIST-JANAF methane data. Acquiring the feedstock and building the rest of the plant would add to the cost.

The plant mass includes the first wall, launch equipment, energy storage, fuel inventories, radiators, conversion equipment, support and refurbishment. The general equipment allowance is the largest entry, about 42.8% of the total.

See the sources and calculations for the full article.